Data Center Buc

Buc, France · 2026

Data center with vertical fins seen across a meadow and trees
Image: AND Studio

At Buc, a 9,000 m² data center and offices sit low on the site, behind old trees and a meadow.

Status
Building permit in preparation
Scale
9,000 m²
Program
Data center and offices; 8 kW
Architect
AND Studio

About

Green and pale vertical fins break the length of the façade.

The building permit was being prepared in 2026.

Aerial site plan of the data centerImage: AND Studio